top of page
1/3
Sanremo (IM) - ITALY
Arcobaleno Luminoso
2010
Client: Executive Hotel
Designer: Ing. Carlo Ostorero
Collaborators: Ing. Stefano Ghedin, Ing. Alessandro Soffredin, Ing. Gianluca Santosuosso
The transformation of the former railway tunnel into an hypogeum pedestrian-hybrid connection within a large recovery plan of the former rail line requires radical redesign intervention on the infrastructure. A permanent installation of variable section blades changes the monotonous and constant perspective of the long covered path. With the help of sensors it is possible to control the chromatic and sound variations that accompany the pedestrian or the cyclist through the new bright rainbow.
bottom of page